Slurry Seal Program
The Slurry Seal Program allows the City to preserve existing paved streets by applying a thin layer of asphalt. Slurry seal is a petroleum-based emulsion product mixed with fine aggregate rock. It slows down the aging process caused by ultraviolet rays, vehicle traffic wear, effects of temperature changes, or the loss and/or stripping of the asphalt. Slurry also significantly reduces vehicle road noise. Using slurry in conjunction with a crack seal program provides the most cost-effective method of preventing premature aging. Slurry sealing is done usually during the summer months, weather permitting.
Slurry seal is applied between the hours of 7:00 a.m. and 5:00 p.m. Once applied, the slurry will dry in about two hours. All work is dependent upon favorable weather conditions. If a street is not sealed on the date specified due to equipment failure or rainy conditions, it will be rescheduled. Residents will be re-notified 48 hours in advance of the new date by the contractor. Weekend work may occur in the event of equipment failures or rainy weather.
Traffic and on-street parking are prohibited while the work is being performed. Residents on affected streets will receive an informational door hanger prior to the beginning of work. NO PARKING signs will be posted approximately 48 hours in advance of the day slurry-sealing will occur on a street. The signs will state the exact closure date and time period. When looking for a place to park while a street is being worked on, check the times and dates carefully on any signs encountered – they might not apply to "today"!
A map of the work planned for 2024 can be found here.
Location | From | To | |
2024 | SE Bay Shore | SE Dockside Dr | SE Dockside Dr |
2024 | SE Brookside Way | SE Midvale Dr | SE Shoreline Dr |
2024 | SE Centerpointe Dr | SE Summerfield Dr | SE Shoreline Dr |
2024 | SE Channel Ave | SE Bayshore Cir | SE Shoreline Dr |
2024 | SE Charlotte Pl | north end of street | SE Rivergreen Ave |
2024 | SE Dockside Dr | SE Bayshore Cir | SE Shoreline Dr |
2024 | SE Hathaway Pl | SE Villa Dr | SE Rivergreen Ave |
2024 | SE Maritime St | SE Shoreline Dr | SE Centerpointe Dr |
2024 | SE Natland Pl | west end of street | SE Summerfield Dr |
2024 | SE Partridge Dr | SE Stellar Dr | east end of street |
2024 | SE Partridge Pl | west end of street | SE Stellar Dr |
2024 | SE Pierpoint St | SE Bayshore Cir | SE Shoreline Dr |
2024 | SE Rivergreen Ave | SE Midvale Dr | SE Shoreline Dr |
2024 | SE Safe Harbor St | SE Shoreline Dr | SE Centerpointe Dr |
2024 | SE Shoreline Dr | SE Maritime St | west end of street |
2024 | SE Summerfield Dr | SE Goodnight Ave | SE Rivergreen Ave |
2024 | SE Summerfield Pl | west end of street | SE Summerfield Dr |
2024 | SE Villa Dr | SE Rivergreen Ave | SE Hathaway Dr |
2024 | SE Villa Pl | west end of street | SE Villa Dr |
2024 | SE Winterfield Pl | west end of street | SE Summerfield Dr |