When is an Erosion Prevention and Sediment Control (EPSC) Permit Needed?
Permits are required for all construction sites that disturb 2,000 square feet or more of land surface. Land disturbance includes any activity that exposes soil, including but not limited to grading, excavating, filling, vegetation removal, or logging.
What is the Cost of the Permit?